Construction Deposits
For lots with construction completed before 2014, Two Rivers of Mukwonago LLC (not the ACB) collected deposits for most lots to ensure that all construction was completed appropriately. If your home was completed before 2011, Two Rivers LLC has closed their books (the LLC has been legally dissolved), and it will not be refunded.
There is one home being built at this time, and one unimproved lot. The home under construction (on Wegner Drive) has submitted a $1000 construction deposit.
There are several requirements before a construction deposit can be returned. They are:
Once these requirements have been met, notify the ACB (Architectural Control Board) via the contact form. The ACB will verify all of the requirements and inform the homeowner as to the process of getting the deposit back.
There is one home being built at this time, and one unimproved lot. The home under construction (on Wegner Drive) has submitted a $1000 construction deposit.
There are several requirements before a construction deposit can be returned. They are:
- All house construction must be completed and construction debris removed
- Driveway must be completed
- Lawn must be fully landscaped according to plan, seeded, and healthy
- Approved mailbox must be installed in approved location
- Approved lamppost must be installed, functional, and on every night
- Two approved, living, and properly sized trees must be planted in the lawn space between the sidewalk and the road
Once these requirements have been met, notify the ACB (Architectural Control Board) via the contact form. The ACB will verify all of the requirements and inform the homeowner as to the process of getting the deposit back.